Custom pump casing castings
Custom pump casings and volute housings made to your drawing. Identify connection faces, material grade and surfaces to machine.

Explore individual component examples
Each example opens a separate page with its supplied photograph, visible features, source and drawing review checklist. Example references are not catalogue model numbers.
Pump casing with circular machined faceThe supplied image shows a red casing with a large circular face, central opening and radial exterior ribs.
Flanged volute casing exampleThe supplied image shows a red volute-shaped housing with a circular inlet and a flanged outlet.
Uncoated pump housing exampleThe supplied image shows an uncoated housing with circular openings, a flanged upper connection and mounting feet.Specification notes
| Product basis | Custom OEM component; drawing or sample review |
|---|---|
| Part number / revision | Customer part number and approved drawing revision |
| Material | Specify grade and standard for technical review |
| Dimensions / tolerances | As agreed from the drawing; no catalogue-wide numeric limit |
| Supply scope | Confirm casting, machining, finishing and inspection separately |
Application and supply scope
Identify the pump assembly, fluid or service environment, drawing revision and which surfaces are supplied machined. A casing photograph does not establish a complete pump performance curve.
How this page helps your purchasing decision
Use the casing examples to identify your component family, then use the specification checklist to prepare the flow-path, connection and sealing requirements for review. This helps the buyer compare casting-only and machined-component quotations using the same drawing scope.
Features to identify on your drawing
Flow-path geometry, flange interfaces, sealing faces, mounting features and the relationship between mating bores.
Conditions to confirm before selection
Pressure, temperature, wall thickness, connection standard, corrosion or wear requirements and acceptance tests must be stated in the project specification.
Manufacturing and inspection evidence
The INMORE catalogue describes casting and machining resources, CMM and dimensional inspection, material analysis and selected non-destructive testing resources. Select the checks and reports required for this part before ordering. Equipment photographs are not a test report for the illustrated component.
Prepare a comparable quotation
Include part number and revision, material grade, quantities, machining scope, surface treatment and inspection requirements. Ask for tooling, casting, machining and documentation to be identified separately in the quotation.
Source and specification status
The supplied INMORE catalogue, physical page 7, supports this component scope. Exact model identity, numerical limits and product-specific reports are agreed from project documents.
Installation and interface review
Compare suction and discharge connections, assembly mounting faces and shaft centreline references. Mark wall and machining requirements on the drawing.
What to include in this enquiry
Pump assembly drawing, connection geometry, casing material, machining scope and required inspection. Include the complete existing part number and suffix if available, document revision, quantities and required acceptance records.
| Review item | What to provide | Current basis |
|---|---|---|
| Casing drawing / flow passage | Identify the requirement on the controlled drawing or project specification | Project confirmation required |
| Flange and sealing faces | Identify the requirement on the controlled drawing or project specification | Project confirmation required |
| Service fluid / pressure / temperature | Identify the requirement on the controlled drawing or project specification | Project confirmation required |
| Material | Grade, standard and required material records | Catalogue lists material families; part-specific grade not assigned |
| Traceable identity | Customer part number and drawing revision | No fixed catalogue model is assigned |
| Inspection evidence | Feature list, acceptance limits and required reports | Catalogue resource photographs; part-specific records to be agreed |
Is this a stock item with a fixed model number?
This is a drawing-based product family. Identify the part with your approved drawing number and revision; stock, compatibility and a fixed model are not stated here.
Can I request both casting and machining?
The company catalogue covers casting and machining resources. Mark the surfaces and supply condition required so the proposed manufacturing scope can be reviewed.
Sources
Applications
Pump manufacturingDrawing-based pump housings, volute casings and impellers for OEM technical review.
New pump component developmentA procurement review route for new pump component development. Confirm the drawing, supply scope and evidence before ordering.
Repeat or replacement pump component reviewA procurement review route for repeat or replacement pump component review. Confirm the drawing, supply scope and evidence before ordering.Capabilities
Casting process reviewReview material and casting route against the drawing.
CNC machining reviewIdentify datums, machining allowances and acceptance criteria.
Resin sand casting reviewResin sand is one of the casting routes listed in the company catalogue.
Component reference only; manufacturing route and specification require drawing review.Shell molding reviewShell molding is listed among the available manufacturing routes.
Component reference only; manufacturing route and specification require drawing review.Investment casting coordinationInvestment casting is coordinated through the manufacturing partner network.
Surface treatment requirementsSurface treatment is included in the company scope; the exact treatment system is agreed for the project.Technical resources
Quality and inspectionHow to request project-specific inspection evidence.
Pump component examplesReview supplied component photographs alongside the drawing-based product families.Selection guides
How to specify material for a pump casingStart with service conditions and the drawing, then agree a material grade.
What should a CMM report show?Tie each reported value to the drawing feature and its acceptance limit.
What to include in a casting RFQSend enough information for a like-for-like quotation.Can a supplier coordinate multiple component types?Internal evidence review — not published
Supplier evaluation and manufacturing responsibilityResolve the project questions below before agreeing component specifications and supply scope.
Casting RFQ, quantities and quotation scopeResolve the project questions below before agreeing component specifications and supply scope.How should alternative material grades be approved?Internal evidence review — not published
Material grades and specification reviewResolve the project questions below before agreeing component specifications and supply scope.
Casting geometry and process reviewResolve the project questions below before agreeing component specifications and supply scope.
Machining datums, features and inspection planningResolve the project questions below before agreeing component specifications and supply scope.
Pump casing and impeller design reviewResolve the project questions below before agreeing component specifications and supply scope.How is lot traceability maintained?Internal evidence review — not publishedHow are inspection instruments calibrated?Internal evidence review — not publishedHow are material certificates linked to batches?Internal evidence review — not publishedWhat should a corrective action report contain?Internal evidence review — not publishedHow are inspection records retained?Internal evidence review — not published
Inspection methods, reports and acceptanceResolve the project questions below before agreeing component specifications and supply scope.How is tooling ownership handled?Internal evidence review — not publishedHow should Incoterms be specified?Internal evidence review — not publishedWhat documents are required for customs clearance?Internal evidence review — not publishedWhen is reverse engineering appropriate?Internal evidence review — not published
OEM samples, revisions and repeat ordersResolve the project questions below before agreeing component specifications and supply scope.
¿Cuándo reparar o reemplazar una bomba de pulpa?Compare las horas entre fallas, el daño y el punto de operación antes de decidir si cambiar piezas de desgaste o reemplazar una bomba de pulpa.
What to Include in a Casting RFQPrepare a casting RFQ with the controlling drawing, material, quantities, machining scope, and inspection requirements. See the additional checks for pump casings.
¿Qué debe pedir una minera en la prueba de aceptación de una bomba de pulpa?Defina qué bomba se ensayará, con qué fluido, en qué puntos de caudal y altura y bajo qué criterios se aceptará.
How to Review a First-Article CMM Report Against a Valve Body DrawingMatch each result to the current drawing, verify the datum setup, and resolve exceptions before production release.Discuss your drawing
Prepare your RFQ · Company contact details
Preview form: submissions stay on this computer.

Custom pump impeller castings