Quality and inspection
How to request project-specific inspection evidence.

Additional component examples












Match evidence to the drawing
Request a report template or approved example. Agree dimensional features, sampling, report ownership and traceability. CMM or magnetic-particle inspection should be specified with the applicable feature, method and acceptance criteria.
Inspection resources shown in the catalogue
Physical pages 9 and 10 show CMM, handheld 3D scanning, material analysis, magnetic particle testing, ultrasonic testing and radiographic inspection resources.
Request evidence for the actual part
Identify the drawing feature, acceptance criterion, inspection method, sampling requirement and report needed. Request records that identify the part and revision. Availability of a resource does not mean every test is included for every component.
Sources
Relevant product families
Custom valve body castingsCustom valve body castings for OEM assemblies. Share your drawing, material grade and machining scope for a quotation review.
Custom pump casing castingsCustom pump casings and volute housings made to your drawing. Identify connection faces, material grade and surfaces to machine.
Custom machinery castings and housingsCustom housings, brackets and structural castings for industrial machinery. Mark critical bores and mounting faces on your drawing.Related buyer questions
How to specify material for a pump casingHow to evaluate a custom casting supplierWhat should a CMM report show?What to include in a casting RFQCan a supplier coordinate multiple component types?Supplier evaluation and manufacturing responsibilityCasting RFQ, quantities and quotation scopeHow should alternative material grades be approved?Material grades and specification reviewCasting geometry and process reviewMachining datums, features and inspection planningPump casing and impeller design reviewValve body and cover requirementsHow is lot traceability maintained?How are inspection instruments calibrated?How are material certificates linked to batches?What should a corrective action report contain?How are inspection records retained?Inspection methods, reports and acceptanceHow is tooling ownership handled?How should Incoterms be specified?What documents are required for customs clearance?When is reverse engineering appropriate?OEM samples, revisions and repeat orders¿Cuándo reparar o reemplazar una bomba de pulpa?What to Include in a Casting RFQ¿Qué debe pedir una minera en la prueba de aceptación de una bomba de pulpa?How to Review a First-Article CMM Report Against a Valve Body DrawingCome confrontare un preventivo per un getto grezzo con uno per un pezzo lavorato?
