INMORE

Technical guides

How to Review a First-Article CMM Report Against a Valve Body Drawing

Match each result to the current drawing, verify the datum setup, and resolve exceptions before production release.

Start with the controlling drawing and revision. Match each result from the coordinate measuring machine (CMM) to a drawing requirement, verify the datum reference and units, and document how exceptions are resolved before production release.

Can you trace each result to the drawing?

Check the part number, revision, sample identifier, and condition of the part when measured. Use a drawing with numbered inspection characteristics, or an equivalent cross-reference, to link each report row to its requirement. Identify features verified separately and features with evidence still due.

Does the report verify the right characteristic?

Compare the result and units with the applicable drawing limit. For example, a flange bore can meet its diameter tolerance while the bolt-hole pattern still needs its own position measurement. Check that the report identifies the datum reference and setup used for that position evaluation.

Illustrative coordinate measuring machine probing the flange of a valve body.
Illustration of a CMM stylus probing a generic valve body flange. The bore and bolt-hole pattern are separate inspection features.

What should happen before release?

Record the feature number, drawing requirement, and measured result for every exception. Agree whether a corrected report, a remeasurement, or a written engineering disposition is needed. Keep the original result with the response and confirm that the responsible authority has approved any exception before release.

Frequently asked questions

Does the CMM report verify leak tightness?

Use the CMM report for the dimensions it covers. When the order requires a leak test, check the separate test record against the agreed acceptance criteria.

Sources

Related products

Contact INMORE

For a drawing-based valve body inquiry, send INMORE the authorized drawing, the required inspection scope, and the report format.

Contact INMORE

Continue this topic