INMORE | Drawing-based casting RFQ checklist Drawing revision and 2D drawing (3D model if available) Material grade and applicable standard Prototype and annual quantities Required condition: raw, machined or surface treated Critical dimensions, datums, tolerances and inspection reports Tooling scope, delivery destination and required timing Confirm confidentiality arrangements before sharing restricted drawings.